The Benefits the Concept Brings
- Safety: no jumping the gap or swinging on a rope;
- accommodation onboard, not adjacent to live plant.
- Increases NUI productivity.
- Reduces costs associated with helicopters.
- Allows ROV work to be liquidated from the vessel.
- Accommodation, workshops and transport on standby vessel. Helicopter in field shuttling almost eliminated.
- Lost time due to fog is a thing of the past.
- Operational Interventions to NUI’s on the same day, with potential 1-2 hour response time.
- Reduces the amount of work to be done onshore.
- Gratings, spools, etc. can be hot-worked on board.
- 2-3 NUI’s per day easily achieved.
- Transfer of fluids and power is possible.