The OAS provides a safe, efficient and reliable transfer system between a vessel and a fixed structure allowing unparalleled levels of access. However, that is only part of the story, with the correct vessel selection the OAS vessel can also:
During the construction phase, the OAS vessel can provide accommodation for commissioning activities, thereby freeing up the expensive lift barges from 'hotel' duties, allowing for optimum utilisation.
This could have significant cost benefits to a project and allow reduction in overall installation timescales.
There could be a reduction in overall onshore facilities such as warehouse storage for spares and workshops.
Costs associated with personnel travel will be reduced as there will be minimal need for hotels.
Risks will be reduced due to the reduction in personnel travelling to/from onshore.
Staff retention will be improved due to greater comfort levels and controlled working hours.
Offshore Solutions are able to assist with vessel selection and provide 'front-end' information for all stage of wind farm development