Offshore Solutions B.V. has successfully fitted its third Offshore Access System (OAS).
The OAS was installed on the Equinox Offshore accommodation repair vessel system ARV1 during week 33, using the 150 tonne "Sea Horse" lifting barge, at the Sembawang ship yard Singapore. The Equinox Offshore accommodation repair vessel system provides a floating accommodation; work platform and logistics support facility like no other marine system existing in the world today.
The OAS is due to be commissioned later on in the year and sea-trials will commence after the ARV1 docking period. More information can be found on http://www.equinoxnrg.com/arv